The History of Rüdinger Freight Forwarder, Germany

 

1930

❱  The company is founded by Franz Rüdinger

1955

❱  Construction of a car hall

1960

❱  Helmut Rüdinger takes over the freight forwarder

 

 

The beginning of the freight forwarder in a few historical pictures: the first truck.

 

 

 

Bus and castle. Over and over again, Krautheim Castle has always been used as a classic photo background for the freight forwarder's vehicles. That was the case 50 years ago, and it will still be the case 50 years from now.

 

1961

  Construction of office and handling hall

1965

  Extension of forwarding hall

1984

❱  New construction of bus depot with repair garage

❱  District freight forwarder of KHD Cologne

1985

❱  Beginning of volume transport

1990

❱  Our own development of tarpaulin low loader

  Rear widening tarpaulin low loader

❱  Start of machine transport

1992

❱  New construction of a forwarding facility: transshipment hall, 2,400 m² with car wash and office building

1993

❱  1st trade fair stand at EUROCARGO Stuttgart
❱  Seminars for customers

❱  Customer events with canoe tour

1997

  Bus transport, double-decker loading, lifting roof

1999

❱  Change of the generation: Handover of the company from Helmut Rüdinger to Roland Rüdinger

❱  General cargo cooperation with ONLINE Systemlogistik

2001

❱   Lowbed semitrailer as tarpaulin low loader

2003

❱  Vehicle fleet reaches the dimension of 100 trucks

2005 ❱  Double-deck transport for books
❱  General cargo: paperless handling of shipment on scanners
❱  Cooperation with expeditors for air freight
2006

❱  Purchase of 10 Kögel semi-trailers with 14.9 m loading length
❱  Extension of our parking lot by 9,000 m² for 150 trucks
❱  1,500 m² long goods hall
  2nd groupage cooperation CTL
❱  Fleet management system "Couplink" with navigation and localisation

2007

❱  Dispatch point for regional traffic

❱  Expansion of fuelling system to include vegetable oil, biodiesel and Ad Blue
❱  Expansion of the handling hall by 2,000 m² to 4,200 m²

2009

❱  Electronic disposition
❱  Customer magazine Orange³;

2010

❱  80th company anniversary

❱  Crane truck for roof light domes
❱  Takeover of PUCARO logistics on 6,000 m² warehouse space

2011

❱  Rüdinger drives the world's first low-loader, with a 30 cm longer bed as standard

❱  Elvis part-loading system

❱  Vehicle fleet 150 trucks

2012

❱  New disposition building with 40 workplaces and event and training rooms on the 1st floor

2013

❱  Tyre tread measuring system "Ventech"

❱  Launch of customs, air and sea freight

  DEKRA certification machine transport

  Event series wissen³ for employees

2014

❱  Divis system for video documentation in the transshipment hall

2015

  "Apache" measuring and weighing system

❱  Air freight office at Stuttgart Airport

❱  Dispo desk regular traffic for daily unchanging tours

2016

❱  Certification of Authorised Economic Operator AEO F

❱  Major trial of gigaliners / long trucks – connection to the positive network starting in May

❱  DUALIS seal for above-average education

❱  Seaport Office in Hamburg

❱  Anti-slip flooring in all new vehicles

❱  Shop floor management

2017

❱  Regio-Bus line Künzelsau - Bad Mergentheim

❱  Air freight security certification "regulated agent"

❱  DAF low-deck liner 92 cm

❱  Contract logistics

2018

❱  Digitalisation Award VerkehrsRundschau

2019

❱  Groupage cooperation 24plus and CargoLine

2020

❱  90th company anniversary

❱  Receiving the award "Oscar for German Medium-Sized Businesses"

2021 ❱  Award as Top 100 Innovator 2021
2023

❱  Award of the business magazine Focus as Growth Champion 2023

❱  Award as Top 100 Innovator 2023

Warehouse Logistics History

 

1995 - 2006: Boxberg with 4 warehouses and 10,600 m²

2008 - 2012: Expansion Boxberg with 7 warehouses and 12,900 m²

2014 - 2015: Dörzbach Röntgenstraße with 3 warehouses and 10,000 m²

2016 - 2018: Osterburken with 6 warehouses and 20,000 m²

2018: Expansion Dörzbach Max-Planck-Straße with 3 warehouses and 5,900 m²

2019: Expansion Boxberg "Mühleck" with 2 warehouses and 5,200 m²

 

2019: Weikersheim with 2 warehouses and 6,900 m²

 

2019 - 2020: Waldenburg with 2 warehouses and 8,000 m²

 

A lot has changed at the company headquarters in Krautheim in 90 years.

 

 


Rüdinger Spedition GmbH

 

Uferweg 12

74238 Krautheim

 

Phone: +49 62 94 / 908-0

 

 

Attendorn Branch

 

Askay 21

57439 Attendorn

 

Phone: +49 27 22 / 6 57 36-0

 

 

Our Airport Office (STR)

 

Building 605, Room 4305

70629 Stuttgart-Airport

 

Phone: +49 711 / 948-22 90

 

 

Our Office in Hamburg

 

An den Birken 20

21266 Jesteburg

 

Phone: +49 41 81 / 23 23-320

 

 

Druckversion | Sitemap
Die Rüdinger Spedition - Von der Kurierfahrt bis zum Maschinentransport